Our Punch List

 Proposed work to be done
 Hull/Exterior 
                - Replace “broken off through hull discharge fitting – starboard side mid ship boot top – (1)
                - remove, repair, re-bed/seal and fasten bow rail stanchions (2)
                -repair aft starboard lifeline stanchion (5)
                - replace rust stained and opened sections of life lines (4)
                -tighten loose cockpit grabrail (6)
                -re-attach propane locker hinges (19)
                -Bottom paint boat
                -Wet Sand and buff topside
                -inspect and reattach anchor locker hatches if necessary (16M)
                -repair/replace loose bungs on teak weather deck cap rail (18M)
                -inspect port and starboard weather deck covering plates, lift out, dry and rebed/seal (19M)
                -inspect coach roof section and reseal fastners to life cradle if necessary (21M)
                -inspect and repair emergency tiller access point in aft cabin (25M)
               
Systems
                -Replace flexible fluid carrying inlet house and clamp to the forward head toilet (7)
                -Secure 12 volt DC electric bilge pump (8)
                -Secure auxiliary engine raw water internal sea strainer, replace corroded hoses (10)
                -replace aft port and starboard weather deck scupper carrying hoses (11)
                - inspect and replace if necessary raw water exhaust hose, double clamp (13)
                -cover and protect exposed bus bar (14)
                -install “suction intake” to the puck up side of manual bilge pump (15)
                -Replace LPG solenoid valve housing, regulator and piping; test system (16)
                -test and replace as necessary batteries, label extensively for future clarification (17)
                -Service and make operational the windlass (18)
                -reconfigure bilge pumps to work properly directly off batteries  with independent control (23)
                -reconnect ground wire to fuel tank under salon (22)
                -secure all loose fittings and filters  in water system(13M)
                -free up securing dog in forward head (22M)
                -Double clamp all throughhull flexible hoses and attach chaffing gear if necessary (2R, 3R)
                -Ensure all navigational lights are working, replace missing running light (8R)

Engine
                -Pressure test fuel tank (12)      
                -Have Yanmar technician inspect engine
                -Adjust and tighten stuffing box, repack if necessary (20)
                -Lubricate engine controls , replace neutral control if necessary (21)
                -inspect cutlass bearing (1M)
                -inspect propeller, recondition and balance if necessary (2M)
                -Clean bow thruster tunnel, replace blade (3M)

Other
                -repair delaminated anchor locker split (6M)
                - clean “Dynaplate” (5M)
                - Paint and label emergency tiller (15M)
                -inspect thoroughly rig (20M)

Safety Equipment to be purchased/installed

                -Service all fire fighting equipment (5R)
                -USCG Life raft (1AOR)
                -EPIRB (1EOR)
                -non-choke diaphragm bilge pump (2G)
                -3  Immersion Suits (3DOR)
                -Marine first aid kit (3G)
                -Compass deviation card prepared (5G)
                -USCG PFD’s for vessel (1G)
                -Corrected charts for all waters to navigate (4G)
                -USCG Day and night distress signals (6GR)
                -whistle and bell (7GR)
                -Flare Kit and fog horn, radar reflector (1CFGOR)
                -Safety Harnesses (1HOR)
                -Installation of Carbon monoxide detector (1BR)
                -Installation of high bilge water level alarm (1CR)
                - USCG approved ring buoy (1DR)
                -MOB float pole w/ flag (1IOR)
                -Anchor Drogue (1JOR)
                -Abondon Ship package (1KOR)
                -Heaving line (1LOR)
                -Bilge pump for inflatable (1MOR)
                -Hand held GPS (1NOR)
                -Attach proper placards (4R)